PFISTERER Kontaktsysteme GmbH
PFISTERER Kontaktsysteme GmbH
04.05.2023 02:05
Energy distribution and energy transmission have been PFISTERER core competences for almost 100 years. As experts for interfaces in energy networks, we supply connection components and turnkey cable systems for all voltage levels as a complete system. Our PLUG, CONNEX and SEANEX pluggable systems as well as our SICON connector connect all system parts of the wind farm reliably and quickly. All system components are made specifically for maritim operation: weather-resistant, salt-water resistant and designed for offshore environment.
Constructing cable systems on offshore substations requires the ultimate discipline of cable-laying. Highly complex cable routes must be installed in a confined space around many corners and on several levels. Considerable time pressure and the construction of other subsections at the same time further complicate the task. Successfully overcoming this challenge requires meticulous planning and specialists with solid experience in the industry. PFISTERER has been there from the very beginning. We have closely accompanied the process from the idea of a power station on the high seas to the construction of the first offshore wind farm. PFISTERER has set industry standards, our project management and our products are state-of-the-art today. With SEANEX up to 72,5 kV and CONNEX for higher voltage levels offers PFISTERER dry pluggable connection systems for all offshore requirements.
06.08.2024 01:05
PFISTERER Kontaktsysteme GmbH at the CIGRE Paris SessionPfisterer is represented at the CIGRE Paris Session.
from 25.08...
Winterbach, Germany - July 2024 -
With PLUG MARINE, PFISTERER offers a DNV-GL-certified h...
Winterbach, Germany – 06 February 2024 – The CONNEX pluggable connection system...
Winterbach, Germany - November 7, 2023
The DolWin kappa offshore platform was suc...
Winterbach, Germany – 26 September 2023 –
TenneT, a transmission network oper...